skip to Main Content

Fox Creek Circuit, Kellyville

To enable earlier housing construction to start from the client, the roads and drainage were built from the high point on the site rather than from the low point up. This was possible through specific water management, including pumping and special purpose temporary tailout drains. The other challenges that were managed were interfacing with environmentally sensitive riparian areas and additional wind factors on the design and construction of the retaining walls.

Back To Top